A snagging report is the document that comes out of a snagging inspection — every snag found, where it is, who's fixing it, and the photo evidence. Here's exactly what to include, based on the reports SiteSnap Pro produces on real paving jobs.
You can build a snagging report by hand — walk the job with a snag list template, photograph everything, then paste photos into a document against each entry. It works, but an hour of walking turns into an evening of formatting.
The alternative: raise each snag with photos as you walk, and let the app do the assembly. SiteSnap Pro turns a day's snagging into a branded PDF — your logo, one, two or four photos a page, before/after side by side, dates and locations printed on or left off — in a few taps. Start a 14-day free trial, or see how the snagging workflow works.
Project details, inspection date, a count of open and closed snags, and one photo-evidenced entry per snag with location, description, assigned trade and dates raised/closed.
It's evidence. A dated, photographed report is routinely used in payment disputes and defects claims — which is why timestamps and locations on photos matter.
As long as the snag count demands. Length doesn't matter; specific, photographed, dated entries do.
Start your 14-day free trial. No card needed.